“Fantastic company! Jack was honest, professional and extremely knowledgeable. He explained everything that was wrong in great detail. Will definitely be calling him for any future plumbing needs.”
Kitchen Remodel Plumbing Done Right
Moving a sink two feet sounds trivial until you find out what is under the floor. Kitchen plumbing is governed by drain slope, vent position and what the existing stack will accept — and every one of those is cheaper to solve on paper than after the cabinets are set.
Financing from Wisetack
Split a water heater, repipe or full remodel into predictable monthly payments. Instant decision, no hidden fees, no compounding interest. See how it works.
2-Year Workmanship Guarantee
Every repair, replacement and remodel we complete is backed in writing. If our workmanship fails, we come back and put it right at no charge. What's covered.
Where we get involved
Ideally at the layout stage. We read the plan, check what the existing drain and vent can support, and tell your designer what will and will not work before anything is ordered. Islands with sinks are the usual sticking point: venting an island drain has specific requirements and the answer depends on your slab or crawlspace.
Rough-in and trim
We rough in the supply and drainage, set the pot filler and ice-maker lines, run the dishwasher and disposal connections, and come back for trim-out once the counters are in. Fixtures land where the plan says, and we test everything under pressure before we leave.
Working around other trades
We schedule around your cabinet, counter and tile crews, protect finished surfaces, and keep the inspection on the calendar so nobody is waiting on us to book.
What's included
- Plan review before anything is ordered
- Sink relocation and island drain venting
- Pot filler and filtered-water lines
- Dishwasher, disposal and ice-maker connections
- Gas lines for ranges and cooktops
- Fixed-scope quote split into rough-in and trim
Kitchen Remodel Plumbing — questions we get asked
Can I move my kitchen sink to an island?
Usually yes, but the venting is the deciding factor and the answer depends on whether you are on a slab or over a crawlspace. We will tell you what it takes on your specific house before you commit to the layout.
When should the plumber come in during a kitchen remodel?
Twice: rough-in after demolition and framing, before drywall; then trim-out after the countertops are installed. Getting us in at plan stage as well is free and saves the most money.
Do you supply the fixtures?
Either way. We can spec and supply, or install what you have chosen — just get us the model numbers early so we rough in for the right fixture.
Kitchen Remodels near you
We cover these areas for remodeling & custom builds. Each page is written for that town.
Other remodeling & custom builds services
Bathroom Remodel Plumbing
The showers people want now — rain head, body sprays and a hand shower, all running at once — ask more of a supply…
Learn moreOutdoor Living & Pool House Plumbing
Outdoor plumbing has one problem indoor plumbing does not: winter. Every line, every fixture and every drain outside…
Learn moreLuxury Fixture Upgrades
You can transform a bathroom without touching the tile. New valves, a thermostatic shower system, a wall-hung…
Learn moreNew Kitchen & Bathroom Plumbing
Putting a kitchen or a bathroom where there was not one before is a different job from replacing the one that is…
Learn moreReady to get it sorted?
Free estimates, upfront pricing, and a licensed plumber who explains what is actually wrong. Call us or send a message and we will come back to you fast.